top of page

BUILDING CONSTRUCTION 2

PROJECT 1 : SKELETAL CONSTRUCTION "A SHELTER FOR ONE"

 

 

In a group of 6, we were required build a shelter that can fit for one person in a sitting position. The shelter must also demonstrate the knowledge of skeletal frames and its joints and should be elevated at least 5 inches from the ground. My group members for this project are Adibah, Hafizi, Amir, Valentine, Azzam and myself. 

The Shelter

The Shelter

The Process

The Process

12336405_977219992324498_201478573_n.jpg

12336405_977219992324498_201478573_n.jpg

12355136_977219995657831_1014355791_n.jpg

12355136_977219995657831_1014355791_n.jpg

12325204_977219982324499_828535815_n.jpg

12325204_977219982324499_828535815_n.jpg

12231269_977219192324578_596375844_n.jpg

12231269_977219192324578_596375844_n.jpg

12357973_977219208991243_1216501818_n.jpg

12357973_977219208991243_1216501818_n.jpg

12355276_977219205657910_1071787986_n.jpg

12355276_977219205657910_1071787986_n.jpg

12348387_977219215657909_733692713_n.jpg

12348387_977219215657909_733692713_n.jpg

12336276_977219182324579_497482901_n.jpg

12336276_977219182324579_497482901_n.jpg

12325335_977219985657832_417239074_n.jpg

12325335_977219985657832_417239074_n.jpg

Recycled plastic was ironed and used as the roof of the shelter

12358231_977219178991246_1714936490_n.jpg

12358231_977219178991246_1714936490_n.jpg

12358095_977219188991245_1405214062_n.jpg

12358095_977219188991245_1405214062_n.jpg

REFLECTION

In this project, I've learnt how to apply construction system in a design. Next, I've also learnt to recognize the implication of construction systems in design and analyse the issues of strength, stiffness and stability of structures including modes of structural systems, forces, stress and strain and laws of static. 

PROJECT 2 : UNDERSTANDING FORCES IN BUILDING CONSTRUCTION

 

 

This project is divided into 2 task, group and individual work. In a group of 2, we were required to propose a building of (tensile/membrane construction or grid shell construction) and identify the structural systems used in the construction of the building of our choice. We must also produce a model on an A3 base showing the different structural systems used in the above building and tto prepare ONE (1) A3 size presentation board, analysing the success or failure of the model together with the mitigating measures. My partner for this project is Prashob Nair and we've chosen Mannheim Multihalle gridshell for the building. Next, for the individual task, we were required to manually draw an exploded Axonometric construction detail on an A3 size sheet.

Final Presentation

Final Presentation

Group Board

Group Board

Individual Board

Individual Board

Overall look of the detailed structure

Part of the building

Part of the building

Mannheim Multihalle Gridshell

12351268_977199068993257_503755301_n.jpg

12351268_977199068993257_503755301_n.jpg

Detailed part

Detailed part

Detailed part

Detailed part

Detailed part

Detailed part

Process

Process

12233246_977200238993140_833265048_n.jpg

12233246_977200238993140_833265048_n.jpg

12355105_977200242326473_103761336_n.jpg

12355105_977200242326473_103761336_n.jpg

12355127_977199118993252_1565405141_n.jpg

12355127_977199118993252_1565405141_n.jpg

12358474_977200248993139_870056489_n.jpg

12358474_977200248993139_870056489_n.jpg

REFLECTION

In this project, I've learnt to identify the basic structural systems in construction and differentiate in terms of loads and forces acting on structural elements. Not only that, I've also learnt to recognize and apply the implications of construction system in my design. 

 

bottom of page